Rotary Club of Mt Eliza Centenary Project: Bay Trail Outline
 
Stage 1  Environmental Work on proposed trail (2021 – 2022)
                This is to be mainly on the Moorooduc station  to Wooralla Drive section. Some work maybe done on the Wooralla Drive to Tanti section or the Station along the Eastlink Trail towards Baxter.
  • Weed removal
  • Conservation of indigenous flora
  • Soil preparation for seedlings etc
  • Purchasing indigenous plant stock
  • Planting
  • Caring for planted stock
  • Signage
This work will be done with consultation with and overseen by the Friends of the Mornington Railway Society. They will suggest the tasks we would do.
 
Stage 2 Moorooduc Station  (2022- 2024)
                The Mornington Railway Preservation Society are replacing their Moorooduc station with the old Cheltenham Station. The footprint of the building must be determined before facilities for the Bike Trail can be sited or even planned. They plan to have that done early in 2022. They will then be able to “point us in the right direction” as to want we can do infrastructure wise. The Club plans to be involved in construction of shelters, bike storage and other infrastructure for Bay Trail users.
 
Stage 3: Trail Construction (2023 - ?)
 
Stage 4 Environmental/Conservation/Trail work at the Moorooduc Station area. (2023 -?)